Steel warehouse buildings firm? The steel structure has the characteristics of lightweight and excellent mechanical performance. Compared with concrete and wood, steel has the smallest ratio of steel density to strength. For example, under the same load strength conditions, the weight of a steel frame is only 30% or 25% of the equivalent concrete structure. The importance of the steel structure house is about 50% of the reinforced concrete buildings, but the use area is about 4% higher than that of the reinforced specific structure.
Basic design principles of metal structure livestock building. The design of the livestock building must ensure the designed structure is reasonable, safe, and reliable. The structure design should meet the requirements of the building, and have sufficient strength, stiffness, and stability, and have excellent durability. The designed structure should save as much steel as possible, reduce the weight of the steel structure, shorten the manufacturing and installation time as much as possible, and it should easy to transport, maintenance and lower costs.
Our company is located in Zhangjialou Industrial Park, Huangdao District, Qingdao City, covers an area of more than 60 acres, the company geographical location superiorly, transportation convenient. We have advanced production equipment, perfect testing facilities, and a quality management system. The workshop covered more than 20000? and equipped with advanced CNC Cutting Machine. Such as Automatic H beam production line,sand-blasting and rust removing the line , Wall and roof sheet production line and another welding machine, lifting types of equipment more than 40 sets. Read even more information on warehouse steel building.
The main functions of the bracing system : 1) Longitudinal Tie Beam transmit longitudinal horizontal force. 2) Roof Horizontal Bracing and Wall Cross Bracing form a partial rigid region, resist the horizontal force transmitted between the column and roof . 3) Fly Bracing used to control the flange plate of H section beam ,avoid the partial local buckling ,reduce the flange plate out-plane calculated length and control the plane stability .
Metal workshop building design from Havit Steel uses high-quality steel, which withstands the effects of severe outdoor weather and allows your employees to operate any machine inside the building. Embedded elements (stabilize the primary frame), It divided into embedded bolt connection and plug-in cup mouth connection. Commonly connection method in general steel workshop building is mainly embedded bolt connections. Such as hinge connection and rigid connection.
The engineering of steel workshop kits are very important , every workshop building are different ,so we will make the detail engineer drawing when start work the project ,after the design drawing confirmed by client then we work the shop drawing for we fabrication , after the building delivery to project site we will make the installation drawing that guide the construction ,the small workshop can finished installation in 1 – 2 month . See more info at here.