Marie Poppins March 12, 2020

Ledgestone retaining wall repair advices: NFC can either be mixed on-site for smaller areas or purchased from a reputable concrete supplier and trucked in for larger commercial applications. NFC is mixed at a 6:1 ratio by volume of 20mm max size clean aggregate and cement. Water content should be such that the cement slurry evenly coats the aggregate and retains a wet/glossy appearance without excess slurry running off, this is typically around 40 litres per 100kg of cement. With the use of NFC, we are able to build Block Retaining Walls in areas and situations where normal construction methods would not work. Some of these situations are: In areas where excavation behind the wall is limited either due to being on a boundary or close to other structures or footings.

Get the first course right. Use a torpedo level to level each block front to back and either a 4-foot or 6-foot level to keep each course level and even. Set the blocks with a heavy rubber or plastic mallet. Getting the first course flat and level is extremely important, so take your time. Try to lay the course as close to the center of the trench as possible. Even a small pebble on the surface of a block will throw the one above it out of alignment. And that crooked block will affect the one above it, and so on. That little stone could eventually create an unattractive hump in the top course.

A wall that leans into the soil it retains is less likely to be pushed outward by soil pressure than a plain-old vertical wall. Design and build your retaining wall to slope at a minimum rate of one inch for every one-foot of rise (height). Fortunately, working with retaining wall blocks makes it incredibly easy to achieve this “step-back” construction! The locking flange on the bottom edge of every block guides it to click into position slightly behind the lower block, preventing the top blocks from being pushed outward.

Perhaps not as builder-friendly for the first-time DIY’er, a concrete retaining wall can nevertheless provide maximum protection for any property against drainage and erosion problems. According to the experts at Quikrete, unlike brick and stone, walls built with concrete do not require additional reinforcement because the width of the base and the weight of the wall provide adequate structural support. The most important step in constructing a strong, attractive concrete wall is building a sturdy, accurate form. Wall forms must be strong enough to withstand the great pressure exerted by the wet concrete; any failure in the forms will be disastrous. A straight wall form is constructed of 1/2-inch, 5/8-inch or 3/4-inch exterior grade plywood sheathing, studs, spacers, ties and walls. Sheathing forms the mold, while studs back up and support the sheathing. Read more details on Building and repair of retaining walls Colorado.

We serve all of Colorado out of our home office in Colorado Springs. Please feel free to reach out to us with any questions you may have. Estimates are always free and everything we touch comes with a warranty. Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery.